- 1
Ingredients
- Add all ingredients to the warehouse

- Choosing by Piece / Ingredient.
- We indicate the Name.
- Choose a Category and go down below.

- Be sure to uncheck the Display for sale.
- We indicate the quantity of goods.
- We choose the unit of measurement.
- We indicate the minimum balance in the warehouse.
- We do not set the price and click Add.

- After adding an Ingredient. You can see it in the warehouse by clicking Products – Warehouse Products.

- Thus, you need to add all the ingredients:
- Cucumbers, tomatoes, onions, pitted canned olives, sweet peppers (Bulgarian), olive oil, basil greens, table salt, dried basil spices.
- 2
Catering business
Hot shop (2 levels of nesting technical card)
- 2.1
Avar khinkal
To create a production, you first need to create the “Avar khinkal” Product, then the Technological Map of the “Avar khinkal” Production:
- Open the Products tab → in the admin panel.
- Click the Add button.

- Choosing by Piece / Ingredient.
- We indicate the Name.
- Select the Category and go down below.

- We leave a check Display for sale.
- We indicate the quantity of goods 0.
- We choose the unit of measurement.
- We indicate the minimum balance in the warehouse.
- Set the price and click Add.

After adding the Product “Avar khinkal”, you can see it in the warehouse by clicking Products – Warehouse goods.

Thus, you need to add all the Products / Dishes that will subsequently be Produced in the program.
To create a routing for Manufacturing:
- Open the Products tab → Dishes in the admin panel.
- Click the Add button.

- Enter the Name, be sure to specify the Production “Avar khinkal”, select the Category and indicate the Workshop where it will be produced.
- Uncheck the “Display for sale” checkbox.
In order to add a Technological map of the “Avar Khinkal” production, we create 2 additional technological maps for Dough for khinkal and Mutton semi-finished product.
- 2.1.1
Technological card “Semi-finished mutton”

- Choosing by Piece / Ingredient.
- We indicate the Name.
- Select the Category and go down below.

- We add all the components and indicate the price per 100 gr.
- 2.1.2
Technological map “Dough for khinkal”

- Choosing by Piece / Ingredient.
- We indicate the Name.
- Select the Category and go down below.

- We add all the components and indicate the price per 100 gr.
On the example of the Production of “Avar khinkals”, you can see a 2-level technological map.

- Choosing by Piece / Ingredient.
- We indicate the Name.
- Select the Category and go down below.

- We add all the components and indicate the necessarily Price per Portion.
- Since the composition of the produced technological map must be a portion and have at the output 1 unit of the produced goods.

- After saving the created Technological map, you can see it in the section Products – Dishes.
- There, all the necessary information is immediately displayed in the columns:
- Name;
- Category;
- Cost price;
- Price;
- Extra charge;
- Exit.
Following the example of the Technological Map Production “Avar khinkal”, you can make all the necessary calculations.
- In the Admin Panel, go to Statistics – Products flow – Production – Add.

- In the field of the technological map we tighten the Production “Avar khinkal”, and in the field End product – “Avar khinkal”
- In the Quantity field, indicate the number of portions you need, taking into account the fact that the composition of the production flow chart should be a portion and have 1 unit of produced goods at the output.

- Go to the Statistics – Production section, select the desired date, point of sale, shift.
- We see the required production document.

- By clicking on the document, you can see what was produced.

- We go to Products – Warehouse goods.
- We find the required document and see that instead of 0 kg of the product “Avar khinkal” we now have 1 kg.

- 2.2
“The Kiev’s cutlets”
To create a production, you first need to create the Product “The Kiev’s cutlets“, then the Technological map of Production “The Kiev’s cutlets“:
- Open the Products tab → in the admin panel.
- Click the Add button.

- Choosing by Piece / Ingredient.
- We indicate the Name.
- Select the Category and go down below.

- We leave a check Display for sale.
- We indicate the quantity of goods 0.
- We choose the unit of measurement.
- We indicate the minimum balance in the warehouse.
- Set the price and click Save.

After adding the Product “The Kiev’s cutlets”, you can see it in the warehouse by clicking Products – Warehouse goods.

Thus, you need to add all the Products that will subsequently be Produced in the program.
In order to create a production routing, you must first create all the necessary routing.
- 2.2.1
Technological map Peeled dill semi-finished product and Peeled chicken fillet semi-finished product

- We indicate the amount of dill (gross) and net after processing and be sure to select Price per 100 gr.

- We indicate the number of chicken fillets before cleaning (gross) and net after and be sure to indicate the Price per 100 gr.

To create a routing for Production:
- Open the Products tab → Dishes in the admin panel.
- Click the Add button.

- Enter the Name, be sure to specify the Production “The Kiev’s cutlets”, select the Category and specify the Shop where it will be produced.
- Uncheck the “Display for sale” checkbox.


- We add all the components and indicate the necessarily Price per Portion.
- Since the composition of the produced technological map must be a portion and have at the output 1 unit of manufactured goods.

- After saving the created Technological map, you can see it in the section Products – Dishes.
- There, all the necessary information is immediately displayed in the columns:
- Name;
- Category;
- Cost;
- Price;
- Extra charge;
- Exit.
Making Production “The Kiev’s cutlets”

- Before Production 0 pcs.

- In the field of the technological map we tighten the Production of The Kiev’s cutlets, and in the field End product – “The Kiev’s cutlets“
- In the Quantity line, we indicate the number of servings you need, taking into account the fact that the composition of the production flow chart should be a portion and have 1 unit of produced goods at the output, in our case 1 piece.

- Go to the Statistics – Production section, select the desired date, point of sale, shift.
- We see the required production document.

- By clicking on the document, you can see what was produced and how much.

- Go to the section Goods – Warehouse goods.
- We find the required document and see that instead of 0 pcs. We have 10 pieces of the product “The Kiev’s cutlets”.

- 3
Semi-finished products store
- 3.1
“Dumplings with cherries”
- Open the Products tab → in the admin panel.
- Click the Add button.
To create a production, you first need to create the Product “Dumplings with cherries”, then the Technological map of Production “Dumplings with cherries”:
- Open the Products tab → in the admin panel.
- Click the Add button.

- Choosing by Piece / Ingredient.
- We indicate the Name.
- Select the Category and go down below.

- We leave a check Display for sale.
- We indicate the quantity of goods 0.
- We choose the unit of measurement.
- We indicate the minimum balance in the warehouse.
- Set the price and click Add.

After adding the Product “Dumplings with cherries”, you can see it in the warehouse by clicking Products – Warehouse products.

Thus, you need to add all the Products that will subsequently be Produced in the program.
To create a routing for Production:
- Open the Products tab → Dishes in the admin panel.
- Click the Add button.

- Enter the Name, be sure to specify the Production of “Dumplings with Cherries”, select the Category and indicate the Shop where it will be produced.
- Uncheck the “Display for sale” checkbox.
In order to add the Technological map of “Dumplings with cherries” production, we created 1 additional tech. map Dough for dumplings.
- 3.1.1
Technological card “Dough for dumplings”
- Choosing by Piece / Ingredient.
- We indicate the Name.
- Select the Category and go down below.

- We remove the check Display for sale.
- We tighten all the names of the ingredients.
- We indicate their number.
- We select the Price for 100 gr.

- 3.1.2
Technological map Production of “Dumplings with cherry”
- We choose Tech. map / Preparation.
- We indicate the Name.
- Select the Category and go down below.

- Добавляем все составляющие и указывает обязательно Цена за Порцию.
- Так как состав произведенной тех. карты должен быть порцией и иметь на выходе 1 единицу производимого товара.

- After saving the created Technological map, you can see it in the section Products – Dishes.
- There, all the necessary information is immediately displayed in the columns:
- Name;
- Category;
- Cost price;
- Price;
- Extra charge;
- Exit.

We make the production Dumplings with cherries
- In the Admin Panel, go to Statistics – Products flow – Production – Add.

- Before Production 0 kg.

- In the field of the technological map we tighten the Production of “Dumplings with cherries”, and in the field End product – “Dumplings with cherries”
- In the Quantity line, indicate the number of portions you need, taking into account the fact that the composition of the produced flow chart should be a portion and have 1 unit of produced goods at the output.
- Click Add.

- Go to the Statistics – Production section, select the desired date, point of implementation, shift.
- We see the required production document.

- By clicking on the document, you can see what was produced.

- We go to Goods – Warehouse goods.
- We find the required document and see that instead of 0 kg of the product “Dumplings with cherries” we have 1 kg.

- Using the example of the pitted Cherry ingredient, you can see that after the production of 1 kg of dumplings with cherries, 376 grams were written off exactly the amount that was indicated in those cards.

- 4
Fast food
- 4.1
“Cutlet in dough”
To create a production, you first need to create the “Cutlet in dough” product, then the Technological map of the “Cutlet in dough” production:
- Open the Products tab → in the admin panel.
- Click the Add button.

- Choosing by Piece / Ingredient.
- We indicate the Name.
- Select the Category and go down below.

- We leave a check Display for sale.
- We indicate the quantity of goods 0.
- We choose the unit of measurement.
- We indicate the minimum balance in the warehouse.
- Set the price and click Save.

After adding the Product “Cutlet in dough”, you can see it in the warehouse by clicking Products – Warehouse products.

Thus, you need to add all the Products that will subsequently be Produced in the program.
In order to create a technological map of Production, you first need to create all the necessary technological maps, we will have a 3-level technological map.
- 4.1.1
1st level Technological card “Minced meat for cutlets”, “Butter dough”
- We indicate the amount of ingredients (gross) and net after processing and be sure to select Price per 100 gr.

- We indicate the amount of ingredients (gross) and the Price per 100 gr.

- 4.1.2
2nd level Technological card “Fried cutlet”
- We tighten the required name of the technological card Minced meat for cutlets, indicate 1 portion gross and net portion after frying.
- Click Save.

- 4.1.3
3rd level creation of a technological map for Production:
- Open the Products tab → Dishes in the admin panel.
- Click the Add button.

- Enter the Name, be sure to indicate the Production of “Cutlet in dough”, select the Category and indicate the Shop where it will be produced.
- Uncheck the “Display for sale” checkbox.

- We add all the components and indicate the necessarily Price per Portion. Since the composition of the produced tech. cards must be a portion and have 1 unit of produced goods at the output.

- After saving the created Technological map, you can see it in the section Products – Dishes.
- There, all the necessary information is immediately displayed in the columns:
- Name;
- Category;
- Cost price;
- Price;
- Extra charge;
- Exit.

Making Production “Cutlets in dough”
- In the Admin Panel, go to Statistics – Products flow – Production – Add.

- Before Production 0 pcs.

- In the field of the technological map, pull up Production “Cutlets in dough”, and in the field End product – “Cutlets in dough”
- In the Quantity line, we indicate the number of servings you need, taking into account the fact that the composition of the production flow chart should be a portion and have 1 unit of produced goods at the output, in our case 1 piece.

- Go to Statistics – Production, select the desired date, point of sale, shift.
- We see the required production document.
- By clicking on the document, you can see what was produced and how much.

- We go to Goods – Warehouse goods.
- We find the required document and see that instead of 0 pcs. of the product “Cutlet in dough” we have 10 pcs.

- 5
Mini confectionery
- 5.1
“Gingerbread”
To create a production, you first need to create the “Gingerbread” Product, then the Technological map of the “Gingerbread” production:
- Open the Products tab → in the admin panel.
- Click the Add button.

- Choosing by Piece / Ingredient.
- We indicate the Name.
- Select the Category and go down below.

- We leave a check Display for sale.
- We indicate the quantity of goods 0.
- We choose the unit of measurement.
- We indicate the minimum balance in the warehouse.
- Set the price and click Save.

- After adding the Product “Gingerbread”, you can see it in the warehouse by clicking Products – Warehouse products.
- Before Production 0 pcs.

Thus, you need to add all the Products that will subsequently be Produced in the program.
- 5.1.1
Making a technological card Production of “Gingerbread”
- Enter the Name, be sure to specify the Production “Gingerbread”, select the Category and specify the Workshop where it will be produced.
- Uncheck the “Display for sale” checkbox.

- We indicate the amount of ingredients (gross) and net after processing and be sure to select the Price per Portion.

- After saving the created Technological map, you can see it in the section Products – Dishes.
- There, all the necessary information is immediately displayed in the columns:
- Name;
- Category;
- Cost price;
- Price;
- Extra charge;
- Exit.

Making Production “Gingerbread”
- In the field of the technological map we tighten the Production of “Gingerbread”, and in the field of the End product – “Gingerbread”
- In the Quantity line, we indicate the number of servings you need, taking into account the fact that the composition of the production flow chart should be a portion and have 1 unit of produced goods at the output, in our case 1 piece.

- Go to Statistics – Production, select the desired date, point of sale, shift.
- We see the required production document.
- By clicking on the document, you can see what was produced and how much.

- We go to Products – Warehouse goods.
- We find the required document and see that instead of 0 pcs. of the product “gingerbread” we now have 100 pieces.
